Skip to content

Shared building interiors

Interior openings during an apartment riser renewal

    An apartment riser renewal may need local openings behind cabinets, wall access in repeated rooms or a larger strip-out in an atypical suite. The plumbing and design team should establish those exposures. The demolition package then identifies the ordinary finishes that need removal without taking over the pipework project.

    Discuss the removal portion through our interior demolition service.

    Begin with the repipe contractor's scope

    Some repipe providers include their own access openings. Confirm that first so a second contractor is not asked to price work already assigned. If a separate removal package is needed, obtain the marked openings, retained fittings and receiving condition.

    Compare the stack suite by suite

    Repeated floor plans are a starting point, not proof that every apartment has the same cabinet or wall arrangement.

    Illustrative suiteAccess proposalException to resolve
    Original layoutLocal finish opening at the trade-marked positionCabinet base and retained fittings
    Renovated kitchenAccess meets altered joineryCurrent layout differs from the standard drawing
    Bathroom already being renewedAccess falls within a wider room stripRemoval depth and responsibility must agree with both packages

    The example does not specify a pipe route or removal method. The engineer and plumber determine their access needs; the contractor assesses the surrounding ordinary building work.

    Trace the opening beyond the visible face

    An opening can meet a countertop, wall backing or ceiling edge that the new installation does not replace. Ask who deals with each retained boundary and whether the receiving trade needs an inspection before closure.

    Management coordinates lawful suite access, building users and the work-area arrangements. The enquiry should not contain tenant records or security details. Water continuity and system isolation remain with the responsible providers; ordinary demolition does not promise uninterrupted service.

    Distinguish opening, installation and reinstatement

    Record who removes the specified finishes, who installs and tests the new pipework, and who closes and repairs the openings. A local opening handed to the plumber is not a completed suite renovation.

    For a Bolan assessment, provide the stack plan, representative and altered suite layouts, access-opening schedule and repipe contact. Identify work already included by that provider. This keeps the demolition contribution assessable without duplicating it or assuming a standard room-by-room programme.

    Related decisions

    Request a Bolan assessment for the removal described above. Include the property location and the decisions identified in this guide.

    Talk to us about your project

    Tell us what needs to come down and where. We'll arrange a site visit and send you a written scope. Calls are answered 24/7.

    WSIB clearance on record. $5M commercial general liability coverage. Established 2006.

    Call 24/7Free Estimate