    A booked shutdown is a place in the facility programme, not confirmation that the demolition area is ready. Define the concrete and ordinary interior removals between specialist preparation and the next installation. The facility remains responsible for the larger shutdown and restart plan.

    Discuss the removal portion through our commercial strip out service.

    Separate the programme milestones

    Ask which systems need specialist attention, which area becomes available and what the next trade needs exposed. Those are distinct milestones even when they share a planned closure window.

    Programme stageResponsible decisionDemolition interface
    Preparation and releaseFacility team and appropriate specialistsConfirm the defined area and affected services
    Ordinary removalsAssessed removal contractor scopeNamed concrete, partitions or finishes leave
    New workReceiving construction and installation teamsAgreed exposed condition, repairs and installation
    RestartFacility and relevant system specialistsDemolition completion alone does not authorise operation

    Compare two illustrative sequences

    For an equipment change, the supplier and handling team manage the machinery. If a separately reviewed ordinary concrete element conflicts with the new arrangement, it can be identified for assessment between those activities. An unidentified machine foundation remains outside an assumed ordinary-concrete scope until its construction and capability requirements are resolved.

    For a staff-area refit, the facility may release a room after the relevant service preparation. The agreed partition, finish and concrete removals then hand over to the fit-out trades. The production equipment elsewhere is a retained boundary, not part of the demolition package.

    These examples show different dependencies; they do not establish a universal machine-base service or promise completion within a fixed shutdown.

    Confirm a workable removal window

    Access, material load-out and unresolved design decisions affect what can be agreed. State which activities must precede removal and which follow it. If preparation changes, review the programme before treating the original start as unconditional.

    A staged renovation outside the main closure may be another option, but the facility and project team must assess whether the areas and routes can be separated. Continued production cannot be assumed from a line on a plan.

    Discuss the demolition contribution

    Provide Bolan with the upgrade objective, defined physical removals, retained process boundary and facility/GC contacts. Explain the proposed window and its dependencies. Keep process isolation, machinery handling, emergency capacity and restart responsibility with their appointed providers.

    Related decisions

    Request a Bolan assessment for the removal described above. Include the property location and the decisions identified in this guide.

    Talk to us about your project

    Tell us what needs to come down and where. We'll arrange a site visit and send you a written scope. Calls are answered 24/7.

    WSIB clearance on record. $5M commercial general liability coverage. Established 2006.

    Call 24/7Free Estimate