Permits and rules

Who removes solar panels, a generator or an EV charger before a teardown?

  • solar panels
  • generator
  • EV charger

Licensed trades do, not the demolition crew: a solar installer or electrician disconnects and removes the panels and inverter, an electrician and a licensed gas technician decommission a standby generator, and an electrician removes the EV charger. The crew then handles the leftover racking and pads afterward.

Newer equipment on an older house needs a little extra planning before the teardown date.

Interior wall taken back to studs and blue electrical boxes ahead of a layout change
Interior wall taken back to studs and blue electrical boxes ahead of a layout change

Why each needs a trade

Each of these systems carries a risk that ordinary demolition does not deal with:

  • Solar panels produce power whenever light hits them, even when the grid connection is off.
  • A standby generator is fed by gas and tied into the house's electrical system.
  • An EV charger runs on a dedicated high-capacity circuit.

What the owner can keep or sell

Solar panels, inverters, generators and chargers often have value. If you want to reuse them on the new house or sell them, tell the trades before removal so they take them out carefully and store them properly. Some owners reinstall panels or a charger on the new home once it is built.

The utility disconnect is not enough for solar

When Oakville Hydro disconnects the service, the house is cut off from the grid. The solar panels on the roof, however, keep generating power on their own. That is why the panels and inverter need their own disconnection by a qualified installer or electrician. Our guide on utility disconnects before an Oakville teardown covers the rest of the services.

Generators and gas

A standby generator is connected to the gas supply and to a transfer switch in the electrical panel. A licensed gas technician caps the gas line, and an electrician disconnects the generator and transfer switch. Only then can the unit be lifted off its pad.

What the crew needs to see before it starts

Before demolition, the crew wants confirmation that:

  • Solar panels and the inverter are removed or confirmed de-energised.
  • The generator gas line is capped and electrical disconnected.
  • The EV charger circuit is disconnected and made safe.

What Bolan does about it

At the site visit, we note any solar, generator or charger equipment and tell you which trade needs to deal with each one. We do not start until those trades confirm the work is done. Afterward, our crew removes leftover racking, mounting hardware and concrete pads as part of the residential demolition, or as part of interior demolition where only part of the house is changing. Request a free estimate and mention any equipment on the property.

Frequently asked questions

Can the demolition crew take down solar panels?
No. Solar panels generate electricity whenever light reaches them, even after the grid connection is cut. A solar installer or electrician needs to disconnect and remove the panels and inverter safely. The crew removes any leftover racking or mounting hardware afterward.
Can I reuse my solar panels on the new house?
Often, yes, if they are in good condition and suit the new roof. Ask the installer to remove and store them carefully rather than simply disconnecting them. They can tell you whether the panels and inverter are worth reinstalling once the new house is built.
Who disconnects a standby generator?
A licensed gas technician caps the gas supply, and an electrician disconnects the generator and its transfer switch from the house's electrical system. Once both are done, the generator can be lifted off its pad and removed. The concrete pad is then broken out by the demolition crew.
Does the EV charger come off with the house?
An electrician should disconnect the charger's circuit and remove the unit first. If you want to reuse the charger on the new house, the electrician can take it down carefully. After that, any wall mounting or pedestal left behind is removed with the rest of the structure.

Talk to us about your project

Tell us what needs to come down and where. We'll arrange a site visit and send you a written scope. Calls are answered 24/7.

WSIB clearance on record. $5M commercial general liability coverage. Established 2006.

Call 24/7Free Estimate